Telecommunication infrastructure

Posted in Personal references

  • Construction of the regional optical cable along the railroad Vrbnica (border crossing with Republic of Serbia) - Bar in Republic of Montenegro, investor Telecom Serbia a.d.
  • Construction of the regional optical cable at the route Bubanj Potok - Paracin, investor Telecom Serbia a.d.
  • Construction of the regional optical cable at the route Novi Beograd - Rumska Petlja,investor Telecom Serbia a.d.
  • Construction of the regional optical cable Mokranje, bridge over Timok, investor Telecom Serbia a.d.
  • Construction of the regional optical cable N13 (Novi Beograd - Novi Sad) - Airport Batajnica - RDLU South Nova Pazova, investor Telecom Serbia a.d.
  • Construction of the optical cable in transport network by KIR procedure at the territory of IJBelgrade/Center, investor Telecom Serbia a.d.
  • Mounting, testing and commissioning of the flexible multiplexer in TK Center Belgrade, investor Telecom Serbia a.d.
  • Construction of OPGW cordwith optical cable at the regional power line Obrenovac A - Belgrade 3, investor JP Elektroprivreda Srbije
  • Construction of the regional optical cable at the route Bubanj Potok - Nis, investor Telenor d.o.o.
  • Construction of the regional optical cable at the route Nis - Dimitrovgrad, investor Telenor d.o.o.
  • Construction of the regional optical cable at the route Dobanovci - Bubanj Potok, investor Telenor d.o.o.
  • Construction of the optical cable for connection of Telenor facilities at the route BSC - MSC Kragujevac - ODF Jovanovac - ODF Batočina, investor Telenor d.o.o.
  • Construction of optical cables between buildings at the Airport Belgrade, TT sewage and optical inlet, investor Agency for flight control of Serbia and Montenegro
  • Construction of optical cable VHF center Rudnik, investor Agency for flight control of Serbia and Montenegro
  • Passive and active computer network on Terminal 1 and VIP Lounge of at the Airport Belgrade, investor Airport Belgrade
  • Main design for expending ofacceSS7 system for mutual calculation of operators and network monitoring based on the signalization №7, TKC Belgrade, TKC Novi Sad, TKC Kragujevac, NMC Novi Beograd, investor Telecom Serbia a.d.
  • Main design for expending ofHP OpenCall IN platform, TK Center, investor Telecom Serbia a.d.
  • Main design for expending offs/cdn IPTV MIDDLEWARE platform and construction of PoP in Novi Beograd, Novi Sad, Niš and Kragujevac, investor Telecom Serbia a.d.
  • Main design for construction and integration of fs/cdn IPTV MIDDLEWARE platform, Republic of Srpska, investor Telecom Srpske a.d.
  • Main design for construction of optical cable for connection of Telenor facilities at the route Dobanovci - Bubanj Potok, investor Telenor d.o.o.
  • Main design for construction of optical cable for connection of Telenor facilities at the route ODF Batočina - Highway E75 (exit for Batocina), investor Telenor d.o.o.
  • Main design for construction of optical cable for connection of Telenor facilities at the route BSC - MSC Kragujevac - ODF Jovanovac - ODF Batočina, investor Telenor d.o.o.
  • Main design of optical cables between buildings at the Airport Belgrade, TT sewage and optical inlet, investor Agency for flight control of Serbia and Montenegro
  • Main design for construction of telecommunication infrastructure of reconstruction of Terminal 1, investor Airport Belgrade
  • Main design of power and telecommunication installations for facilities around PSS Airport Vršac, investor Airport Vršac
  • Main design of power and telecommunication installations for facilities around PSS Airport Niš, investor Airport Niš